{"id":954,"date":"2011-10-21T09:13:47","date_gmt":"2011-10-21T10:13:47","guid":{"rendered":"http:\/\/casariego-guerra.com\/blog\/?page_id=954"},"modified":"2017-12-18T10:34:32","modified_gmt":"2017-12-18T11:34:32","slug":"p-t-e-i-e-de-tenerife-2010","status":"publish","type":"page","link":"https:\/\/casariego-guerra.com\/?page_id=954","title":{"rendered":"[P.T.E.I.E. de Tenerife]  [2010-2012]"},"content":{"rendered":"<p><a href=\"http:\/\/casariego-guerra.com\/?attachment_id=2419\" rel=\"attachment wp-att-2419\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-2419\" title=\"Pages.PLA.IETEN 01\" src=\"http:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/PI-S-1.jpg\" alt=\"\" width=\"950\" height=\"669\" srcset=\"https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/PI-S-1.jpg 950w, https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/PI-S-1-560x394.jpg 560w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/a><\/p>\n<p><span style=\"color: #808080;\">[plano de informaci\u00f3n: esquema de las infraestructuras energ\u00e9ticas existentes en la Isla de Tenerife]<\/span><\/p>\n<h3><span style=\"color: #000000;\">[PLAN TERRITORIAL ESPECIAL DE INFRAESTRUCTURAS ENERG\u00c9TICAS DE TENERIFE]<\/span><\/h3>\n<h3><span style=\"color: #808080;\">[SPECIAL MASTER PLAN OF ENERGETIC INFRASTRUCTURES OF TENERIFE ISLAND]<\/span><\/h3>\n<h6><span style=\"color: #000000;\">Avance: 2008 &#8211; 2012 .<\/span><\/h6>\n<h6><span style=\"color: #000000;\">Situaci\u00f3n: Isla de Tenerife<\/span><\/h6>\n<h6><span style=\"color: #000000;\">Promotor: Cabildo de Tenerife<\/span><\/h6>\n<h6><\/h6>\n<h6><\/h6>\n<p><a href=\"http:\/\/casariego-guerra.com\/?attachment_id=2418\" rel=\"attachment wp-att-2418\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-2418\" title=\"Pages.PLA.IETEN 02\" src=\"http:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/P\u00e1ginas-desdeI_CENSO_TF_10.jpg\" alt=\"\" width=\"950\" height=\"664\" srcset=\"https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/P\u00e1ginas-desdeI_CENSO_TF_10.jpg 950w, https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/P\u00e1ginas-desdeI_CENSO_TF_10-560x391.jpg 560w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/a><\/p>\n<p><span style=\"color: #808080;\">[ficha &#8211; tipo de Informaci\u00f3n de las infraestructuras energ\u00e9ticas existentes y previstas]<\/span><\/p>\n<p>El Plan Territorial Especial de Ordenaci\u00f3n de las Infraestructuras Energ\u00e9ticas de Tenerife es un instrumento de planificaci\u00f3n territorial, y por tanto si bien desarrolla aspectos sectoriales espec\u00edficos, tiene como objetivo fundamental la sistematizaci\u00f3n, jerarquizaci\u00f3n y control del proceso de implantaci\u00f3n de estas infraestructuras en el territorio insular, y todo ello desde la coherencia con el modelo de ordenaci\u00f3n definido en el Plan Insular.<\/p>\n<p><span style=\"color: #808080;\">The Special Territorial Plan for Tenerife\u2019s Energetic Infrastructure constitutes an instrument for territorial planning, developing sector-specific aspects, with the systematization, hierarchy establishment, and control over the processes of implementation of these infrastructures as its fundamental aims. All in accordance with the land-use model defined in the Insular Plan.<\/span><\/p>\n<p><a href=\"http:\/\/casariego-guerra.com\/?attachment_id=2417\" rel=\"attachment wp-att-2417\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-2417\" title=\"Pages.PLA.IETEN 03\" src=\"http:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen23.jpg\" alt=\"\" width=\"950\" height=\"507\" srcset=\"https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen23.jpg 950w, https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen23-560x298.jpg 560w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/a><\/p>\n<p><span style=\"color: #808080;\">[plano de an\u00e1lisis territorial: topograf\u00eda &#8211; cualidad urban\u00edstica &#8211; recurso e\u00f3lico &#8211; sistema de transporte energ\u00e9tico]<\/span><\/p>\n<p><a href=\"http:\/\/casariego-guerra.com\/?attachment_id=2425\" rel=\"attachment wp-att-2425\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-2425\" title=\"Pages.PLA.IETEN 04\" src=\"http:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen12.jpg\" alt=\"\" width=\"950\" height=\"512\" srcset=\"https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen12.jpg 950w, https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/Imagen12-560x301.jpg 560w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/a><\/p>\n<p><span style=\"color: #808080;\">[plano de an\u00e1lisis territorial: clasificaci\u00f3n y calificaci\u00f3n de suelo &#8211; sistemas energ\u00e9ticos b\u00e1sicos &#8211; recursos naturales]<\/span><br \/>\n<span style=\"color: #000000;\">La importancia de las infraestructuras energ\u00e9ticas es com\u00fan a cualquier geograf\u00eda, pero en una Isla es mucho m\u00e1s acentuada, m\u00e1xime cuando la fragilidad territorial es notoria, como ocurre en el caso de Tenerife. Fragilidad que resulta de unas condiciones naturales excepcionales, unidas a un uso intensivo del territorio y a la actividad tur\u00edstica como principal motor econ\u00f3mico. Por tanto, si bien es imprescindible planificar en relaci\u00f3n a las perspectivas de desarrollo futuro, esta condici\u00f3n no debe entenderse s\u00f3lo desde la perspectiva cuantitativa, sino tambi\u00e9n desde la cualitativa.<\/span><\/p>\n<p><span style=\"color: #808080;\">The importance of energetic infrastructures is obvious in any type of geography, but much more pronounced when considering an island, especially when the territorial fragility is evident, like in the case of Tenerife. Fragility resulting from exceptional natural conditions, combined with an intensive use of the land and with tourism as the main economic activity. It is therefore, essential to develop planning strategies taking into account future developments, not only in the quantitative sense but in a qualitative sense too.<\/span><\/p>\n<p><a href=\"http:\/\/casariego-guerra.com\/?attachment_id=2420\" rel=\"attachment wp-att-2420\"><img loading=\"lazy\" class=\"alignnone size-full wp-image-2420\" title=\"Pages.PLA.IETEN 05\" src=\"http:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/RO-001-02.jpg\" alt=\"\" width=\"950\" height=\"831\" srcset=\"https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/RO-001-02.jpg 950w, https:\/\/casariego-guerra.com\/wp-content\/uploads\/2011\/10\/RO-001-02-560x489.jpg 560w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><\/a><\/p>\n<p><span style=\"color: #808080;\">[esquemas anal\u00edticos de la actual Central de Caletillas]<\/span><\/p>\n<p><span style=\"color: #000000;\">En el contexto del presente Plan cobran una especial importancia las energ\u00edas renovables, cuyo impulso constituye en la actualidad un objetivo compartido por los diferentes gobiernos dentro de las pol\u00edticas de mejora medioambiental, y tambi\u00e9n de aprovechamiento de los recursos y avance tecnol\u00f3gico. En Canarias, la importancia de reducir la dependencia energ\u00e9tica, subraya la necesidad de articular los mecanismos y estrategias que permitan alcanzar la m\u00e1xima participaci\u00f3n posible de la generaci\u00f3n energ\u00e9tica de origen renovable, en el plazo m\u00ednimo posible.<\/span><\/p>\n<p><span style=\"color: #808080;\">Within the context of the current Plan, a considerable importance is given to renewable energies, whose advancement is now a goal shared by most governments in terms of policies for environmental improvement, and in terms of the resource utilization and technological advancement. In the Canary Islands, the importance of reducing energetic dependence, underlines the need of articulating the mechanisms and strategies necessary to achieve the maximum participation in energetic generation from renewable sources as possible, and as quickly as possible.<\/span><\/p>\n<h6><span style=\"color: #000000;\">Equipo: U.T.E. IETEN-08 (SOLITEC S.L.P, CASARIEGO \/ GUERRA, arquitectos S.L., VIATRIO Ingenieros S.L. y Abogados As. VIERA Y CLAVIJO 62, S.L.)<\/span><\/h6>\n<h6><span style=\"color: #000000;\">Direcci\u00f3n: Jos\u00e9 Juli\u00e1n Naranjo P\u00e9rez, Bi\u00f3logo (Gerente), Joaqu\u00edn Casariego Ram\u00edrez, Arquitecto, Elsa Guerra Jim\u00e9nez, Arquitecta, Javier M\u00aa Mart\u00ednez Garc\u00eda, Ingeniero CCCCPP, Manuel \u00c1lvarez de la Rosa y Antonio Gonz\u00e1lez-Casanova Rodr\u00edguez, Abogados.<\/span><\/h6>\n<h6><span style=\"color: #000000;\">Colaboradores para Urbanismo y Ordenaci\u00f3n Territorial: Noem\u00ed Tejera Mujica, Rub\u00e9n P\u00e9rez Bautista, Marta Cuy\u00e1s Morales y Silvia Guajardo de la Rosa, Arquitectos. Dibujo y Administraci\u00f3n: Carmelo Garc\u00eda Rodr\u00edguez, Juan Manuel Rivero Su\u00e1rez y Den\u00e9bola Acosta Y\u00e1\u00f1ez.<\/span><\/h6>\n","protected":false},"excerpt":{"rendered":"<p>[plano de informaci\u00f3n: esquema de las infraestructuras energ\u00e9ticas existentes en la Isla de Tenerife] [PLAN TERRITORIAL ESPECIAL DE INFRAESTRUCTURAS ENERG\u00c9TICAS DE TENERIFE] [SPECIAL MASTER PLAN OF ENERGETIC INFRASTRUCTURES OF TENERIFE ISLAND] Avance: 2008 &#8211; 2012 . Situaci\u00f3n: Isla de Tenerife Promotor: Cabildo de Tenerife [ficha &#8211; tipo de Informaci\u00f3n de las infraestructuras energ\u00e9ticas existentes y [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":11,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/pages\/954"}],"collection":[{"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=954"}],"version-history":[{"count":27,"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/pages\/954\/revisions"}],"predecessor-version":[{"id":5163,"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/pages\/954\/revisions\/5163"}],"up":[{"embeddable":true,"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=\/wp\/v2\/pages\/11"}],"wp:attachment":[{"href":"https:\/\/casariego-guerra.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}